PROJECT DETAILS: This job consisted of building a pavilion to split firewood in during bad weather.
The four posts that will hold up the pavilion are in the process of being set into the ground. The gravel in the bottom of the hole prevents the wood from soaking in the water.
After the posts are in, a header for the roof to set on must be constructed.
A crane is used to set the roof on top of the pavilion.
The roof trusses are now assembled and are waiting to be set on the base of the pavilion.
The roof trusses are set and are being attached to the base.